|

click image for Day 1 photos of Dan or click a day in table below
AN HONEST EFFORT - Performance Score
Interior of display window at 135 W 42 St. is painted
gloss white. 228 foam bricks, 8" wide x 12" long x 4"
thick, painted gold, are stacked in the west end of window. The
stack measures 32" wide x 36" long x 76" tall. One
at a time, the bricks are moved to the east end of the window, forming
a new stack. When this is completed (midday Wednesday), the bricks
are then returned, one at a time, to their original position. Action
is continuous without breaks, nine hours a day for five days.
Text -
moving without brick:
It's too much of a task,
It's too much of a task,
It's too much of a task for a man to take,
It's too much of a task for a man to take.
picking up brick:
Be careful, be careful, be careful, be careful, be
careful.
It's heavy, it's heavy, it's heavy.
moving with brick:
I'm never gonna finish this job,
I'm never gonna finish this job.
What a fate, what a fate.
putting brick down:
Don't drop it, don't drop it, don't drop it,
don't drop it.
To mp3 links
Made possible in part with support from the National
Endowment for the Arts.
TOP>>>
|